This project was implemented to control and optimize the consumption of Energy and Materials in three steps as follows:
STEP
1 Installation and calibration of required equipment for
the measurement of electricity, steam and gas consumption in
production and utility units.
STEP
2 Determination of energy consumption in each unit and the amount of energy consumed
per ton of product.
STEP
3 Auditing, control and evaluation of possible means of reduction in energy consumption.
Energy Management Establishment Results
1- Control of energy and materials consumption, and waste reduction.
2- Continual auditing of operational conformance to requirements.
3- Monthly assessment of energy consumption and energy carriers.
Reduction
in Energy Carriers and Materials Consumption