This site The web
 


 Completed Project
1 Master plan of production Project.
2 Preparing the base of Information Technology (IT).
3 Filtration capacity increase for process-unit cooling towers.
4 Advanced process control & optimization.
5 Boiler fuel/Air dynamic control.
6 Industrial waste water evaporation.
7 Modification of DCS control system in production unit.
8 Waste water system review & Evaluation of pretreatment and treatment unit.
9 Pump station building development & installation of water hammer suppression system
10 Improvement of cooling water chlorination system.
11 Internal flushing of refrigeration cycle.
12 Implementation of ENERGY MANAGEMENT SYSTEM.
13 Enhancement of power generation unit control system.
14 Combustion chamber improvement & energy optimization.
15 Quantitative risk analysis in production plant.
16 Computer simulation of fractionation units.
17 Cooling water system optimization.
18 Emergency control room construction.
19 Refrigeration fluid replacement (With environmentally friendly alternatives).
20 Replacement of helium gas used in laboratory by Nitrogen & Hydrogen gases.
21 Improvement of Tanker unloading system.
 
Home | Our Company | Annual Report | Related Links | News & Events | Resources
Products & Services | Expansion Plans & Projects | Management Systems | Requirements | IT Infrastracture
Contact Us | Site Map | FAQ
Copyright © 2003 Esfahan Petrochemical Company. All rights Reserved.